Pricing

Every project is bespoke, due to site conditions, existing house, client brief and technical considerations.

However, below is an outline guide to fees for different scales of projects [updated April 2019].

Further to carrying out an initial consultation, I would provide a fixed fee for stages 1-4 for your project.

The Tendering and Construction phases are charged on an hourly rate, depending on hours accrued. Ad-hoc site stage services are not provided. VAT is not currently required to be added.

 

1. Single-storey extension (smaller)

StageFeesIndicative hours
1Survey and existing drawings£6759 hours
2Concept – outline design£6008 hours
3Develop Design – planning application/PD£1,35018 hours
4Detail Design – Building Warrant application£1,95026 hours
Subtotal£4,57561 hours
5Tendering£6008 hours
6Construction – Completion£150-£188/week2.0-2.5hrs/week

There are also fees such as Structural Engineer and Council fees. These will be advised for each project, in addition to the above guide fees.


2. Single-storey extension (medium/large)

Fees start from:

StageFeesIndicative hours
1Survey and existing drawings£90012 hours
2Concept – outline design£75010 hours
3Develop Design – planning application£1,80024 hours
4Detail Design – Building Warrant application£2,70036 hours
Subtotal£6,15082 hours
5Tendering£1,20016 hours
6Construction – Completion£188-£263/week2.5-3.5hrs/week

There are also fees such as Structural Engineer and Council fees. These will be advised for each project, in addition to the above guide fees.


3. Two-storey / larger single-storey / extension plus loft conversion / one-and-a-half storey / complex site

Fees start from:

StageFeesIndicative hours
1Survey and existing drawings£1,20016 hours
2Concept – outline design£1,05014 hours
3Develop Design – planning application£2,10028 hours
4Detail Design – Building Warrant application£3,00040 hours
Subtotal£7,35098 hours
5Tendering£1,80024 hours
6Construction – Completion£225-£338/week3-4.5hrs/week

There are also fees such as Structural Engineer and Council fees. These will be advised for each project, in addition to the above guide fees.